- Project:
- South Second Street.
- Location:
- Ft. Pierce
- Description:
-
South Second Street. included complete water, sewer and drainage
reconstruction, new curbing, asphalt roadway, roadway / sidewalk
pavers, lighting, landscaping, irrigation and street furniture.
- Completion Date:
- December 2004
|
 |
|